다발무 2005년 12월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 2005/12/22
    5 톤트럭
    3,450,000
  • 2005/12/22
    5 톤트럭
    3,100,000
  • 2005/12/22
    5 톤트럭
    2,600,000
  • 2005/12/22
    5 톤트럭
    2,100,000
  • 2005/12/21
    5 톤트럭
    3,450,000
  • 2005/12/21
    5 톤트럭
    3,100,000
  • 2005/12/21
    5 톤트럭
    2,600,000
  • 2005/12/21
    5 톤트럭
    2,100,000
  • 2005/12/20
    5 톤트럭
    3,680,000
  • 2005/12/20
    5 톤트럭
    3,525,000
  • 2005/12/20
    5 톤트럭
    3,150,000
  • 2005/12/20
    5 톤트럭
    2,930,000
  • 2005/12/19
    5 톤트럭
    3,680,000
  • 2005/12/19
    5 톤트럭
    3,525,000
  • 2005/12/19
    5 톤트럭
    3,150,000
  • 2005/12/19
    5 톤트럭
    2,930,000
  • 2005/12/17
    5 톤트럭
    3,680,000
  • 2005/12/17
    5 톤트럭
    3,525,000
  • 2005/12/17
    5 톤트럭
    3,150,000
  • 2005/12/17
    5 톤트럭
    2,930,000
  • 2005/12/16
    5 톤트럭
    3,680,000
  • 2005/12/16
    5 톤트럭
    3,525,000
  • 2005/12/16
    5 톤트럭
    3,150,000
  • 2005/12/16
    5 톤트럭
    2,930,000
  • 2005/12/15
    5 톤트럭
    3,680,000
  • 2005/12/15
    5 톤트럭
    3,525,000
  • 2005/12/15
    5 톤트럭
    3,150,000
  • 2005/12/15
    5 톤트럭
    2,930,000
  • 2005/12/14
    5 톤트럭
    3,580,000
  • 2005/12/14
    5 톤트럭
    3,380,000
  • 2005/12/14
    5 톤트럭
    3,145,000
  • 2005/12/14
    5 톤트럭
    2,690,000
  • 2005/12/13
    5 톤트럭
    3,530,000
  • 2005/12/13
    5 톤트럭
    3,330,000
  • 2005/12/13
    5 톤트럭
    2,875,000
  • 2005/12/13
    5 톤트럭
    2,105,000
  • 2005/12/12
    5 톤트럭
    3,530,000
  • 2005/12/12
    5 톤트럭
    3,330,000
  • 2005/12/12
    5 톤트럭
    2,875,000
  • 2005/12/12
    5 톤트럭
    2,105,000
  • 2005/12/10
    5 톤트럭
    3,730,000
  • 2005/12/10
    5 톤트럭
    3,470,000
  • 2005/12/10
    5 톤트럭
    2,960,000
  • 2005/12/10
    5 톤트럭
    1,850,000
  • 2005/12/9
    5 톤트럭
    3,720,000
  • 2005/12/9
    5 톤트럭
    3,435,000
  • 2005/12/9
    5 톤트럭
    2,885,000
  • 2005/12/9
    5 톤트럭
    2,155,000
  • 2005/12/8
    5 톤트럭
    3,650,000
  • 2005/12/8
    5 톤트럭
    3,325,000
  • 2005/12/8
    5 톤트럭
    2,810,000
  • 2005/12/8
    5 톤트럭
    2,085,000
  • 2005/12/7
    5 톤트럭
    3,890,000
  • 2005/12/7
    5 톤트럭
    3,755,000
  • 2005/12/7
    5 톤트럭
    3,060,000
  • 2005/12/7
    5 톤트럭
    2,730,000
  • 2005/12/6
    5 톤트럭
    4,780,000
  • 2005/12/6
    5 톤트럭
    4,470,000
  • 2005/12/6
    5 톤트럭
    4,130,000
  • 2005/12/6
    5 톤트럭
    3,785,000
  • 2005/12/5
    5 톤트럭
    4,530,000
  • 2005/12/5
    5 톤트럭
    4,330,000
  • 2005/12/5
    5 톤트럭
    3,965,000
  • 2005/12/5
    5 톤트럭
    3,310,000
  • 2005/12/3
    5 톤트럭
    3,225,000
  • 2005/12/3
    5 톤트럭
    2,975,000
  • 2005/12/3
    5 톤트럭
    2,640,000
  • 2005/12/3
    5 톤트럭
    2,150,000
  • 2005/12/2
    5 톤트럭
    2,790,000
  • 2005/12/2
    5 톤트럭
    2,535,000
  • 2005/12/2
    5 톤트럭
    2,050,000
  • 2005/12/2
    5 톤트럭
    1,530,000
  • 2005/12/1
    5 톤트럭
    2,865,000
  • 2005/12/1
    5 톤트럭
    2,600,000
  • 2005/12/1
    5 톤트럭
    2,110,000
  • 2005/12/1
    5 톤트럭
    1,360,000

다발무 2005년 11월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 2005/11/30
    5 톤트럭
    3,205,000
  • 2005/11/30
    5 톤트럭
    2,875,000
  • 2005/11/30
    5 톤트럭
    2,375,000
  • 2005/11/30
    5 톤트럭
    1,850,000
  • 2005/11/29
    5 톤트럭
    3,390,000
  • 2005/11/29
    5 톤트럭
    3,150,000
  • 2005/11/29
    5 톤트럭
    2,715,000
  • 2005/11/29
    5 톤트럭
    2,100,000
  • 2005/11/28
    5 톤트럭
    4,655,000
  • 2005/11/28
    5 톤트럭
    3,360,000
  • 2005/11/28
    5 톤트럭
    2,955,000
  • 2005/11/28
    5 톤트럭
    1,875,000
  • 2005/11/26
    5 톤트럭
    3,730,000
  • 2005/11/26
    5 톤트럭
    3,350,000
  • 2005/11/26
    5 톤트럭
    2,790,000
  • 2005/11/26
    5 톤트럭
    2,025,000
  • 2005/11/25
    5 톤트럭
    3,680,000
  • 2005/11/25
    5 톤트럭
    3,390,000
  • 2005/11/25
    5 톤트럭
    2,915,000
  • 2005/11/25
    5 톤트럭
    1,995,000
  • 2005/11/24
    5 톤트럭
    3,765,000
  • 2005/11/24
    5 톤트럭
    3,400,000
  • 2005/11/24
    5 톤트럭
    2,825,000
  • 2005/11/24
    5 톤트럭
    1,760,000
  • 2005/11/23
    5 톤트럭
    3,720,000
  • 2005/11/23
    5 톤트럭
    3,415,000
  • 2005/11/23
    5 톤트럭
    2,850,000
  • 2005/11/23
    5 톤트럭
    1,835,000
  • 2005/11/22
    5 톤트럭
    4,340,000
  • 2005/11/22
    5 톤트럭
    3,995,000
  • 2005/11/22
    5 톤트럭
    3,500,000
  • 2005/11/22
    5 톤트럭
    2,640,000
  • 2005/11/21
    5 톤트럭
    4,405,000
  • 2005/11/21
    5 톤트럭
    4,100,000
  • 2005/11/21
    5 톤트럭
    3,530,000
  • 2005/11/21
    5 톤트럭
    2,545,000
  • 2005/11/19
    5 톤트럭
    4,400,000
  • 2005/11/19
    5 톤트럭
    3,315,000
  • 2005/11/19
    5 톤트럭
    2,740,000
  • 2005/11/19
    5 톤트럭
    1,935,000
  • 2005/11/18
    5 톤트럭
    3,460,000
  • 2005/11/18
    5 톤트럭
    3,010,000
  • 2005/11/18
    5 톤트럭
    2,560,000
  • 2005/11/18
    5 톤트럭
    1,980,000
  • 2005/11/17
    5 톤트럭
    3,515,000
  • 2005/11/17
    5 톤트럭
    2,990,000
  • 2005/11/17
    5 톤트럭
    2,500,000
  • 2005/11/17
    5 톤트럭
    1,950,000
  • 2005/11/16
    5 톤트럭
    3,655,000
  • 2005/11/16
    5 톤트럭
    2,970,000
  • 2005/11/16
    5 톤트럭
    2,535,000
  • 2005/11/16
    5 톤트럭
    2,075,000
  • 2005/11/15
    5 톤트럭
    3,855,000
  • 2005/11/15
    5 톤트럭
    3,305,000
  • 2005/11/15
    5 톤트럭
    2,710,000
  • 2005/11/15
    5 톤트럭
    2,200,000
  • 2005/11/14
    5 톤트럭
    3,905,000
  • 2005/11/14
    5 톤트럭
    3,310,000
  • 2005/11/14
    5 톤트럭
    2,690,000
  • 2005/11/14
    5 톤트럭
    2,330,000
  • 2005/11/12
    5 톤트럭
    3,625,000
  • 2005/11/12
    5 톤트럭
    3,185,000
  • 2005/11/12
    5 톤트럭
    2,670,000
  • 2005/11/12
    5 톤트럭
    2,105,000
  • 2005/11/11
    5 톤트럭
    4,055,000
  • 2005/11/11
    5 톤트럭
    3,105,000
  • 2005/11/11
    5 톤트럭
    2,375,000
  • 2005/11/11
    5 톤트럭
    1,900,000
  • 2005/11/10
    5 톤트럭
    3,855,000
  • 2005/11/10
    5 톤트럭
    3,320,000
  • 2005/11/10
    5 톤트럭
    2,585,000
  • 2005/11/10
    5 톤트럭
    2,050,000
  • 2005/11/9
    5 톤트럭
    4,400,000
  • 2005/11/9
    5 톤트럭
    3,715,000
  • 2005/11/9
    5 톤트럭
    3,000,000
  • 2005/11/9
    5 톤트럭
    2,165,000
  • 2005/11/8
    5 톤트럭
    4,205,000
  • 2005/11/8
    5 톤트럭
    3,810,000
  • 2005/11/8
    5 톤트럭
    3,485,000
  • 2005/11/8
    5 톤트럭
    3,080,000
  • 2005/11/7
    5 톤트럭
    4,230,000
  • 2005/11/7
    5 톤트럭
    3,825,000
  • 2005/11/7
    5 톤트럭
    3,305,000
  • 2005/11/7
    5 톤트럭
    2,730,000
  • 2005/11/5
    5 톤트럭
    3,310,000
  • 2005/11/5
    5 톤트럭
    3,015,000
  • 2005/11/5
    5 톤트럭
    2,390,000
  • 2005/11/5
    5 톤트럭
    1,620,000
  • 2005/11/4
    5 톤트럭
    3,670,000
  • 2005/11/4
    5 톤트럭
    3,265,000
  • 2005/11/4
    5 톤트럭
    2,675,000
  • 2005/11/4
    5 톤트럭
    2,060,000
  • 2005/11/3
    5 톤트럭
    4,125,000
  • 2005/11/3
    5 톤트럭
    3,730,000
  • 2005/11/3
    5 톤트럭
    3,325,000
  • 2005/11/3
    5 톤트럭
    2,495,000
  • 2005/11/2
    5 톤트럭
    4,095,000
  • 2005/11/2
    5 톤트럭
    3,765,000
  • 2005/11/2
    5 톤트럭
    3,155,000
  • 2005/11/2
    5 톤트럭
    2,655,000
  • 2005/11/1
    5 톤트럭
    4,095,000
  • 2005/11/1
    5 톤트럭
    3,765,000
  • 2005/11/1
    5 톤트럭
    3,155,000
  • 2005/11/1
    5 톤트럭
    2,655,000

다발무 2005년 1월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 2005/1/5
    5 톤트럭
    1,025,000
  • 2005/1/5
    5 톤트럭
    825,000
  • 2005/1/4
    5 톤트럭
    1,125,000
  • 2005/1/4
    5 톤트럭
    810,000
  • 2005/1/3
    5 톤트럭
    1,125,000