다발무 1999년 12월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1999/12/20
    5 톤트럭
    2,750,000
  • 1999/12/17
    5 톤트럭
    2,750,000
  • 1999/12/17
    5 톤트럭
    2,150,000
  • 1999/12/16
    5 톤트럭
    3,100,000
  • 1999/12/16
    5 톤트럭
    2,350,000
  • 1999/12/15
    5 톤트럭
    3,150,000
  • 1999/12/15
    5 톤트럭
    2,350,000
  • 1999/12/14
    5 톤트럭
    2,700,000
  • 1999/12/14
    5 톤트럭
    2,150,000
  • 1999/12/13
    5 톤트럭
    2,900,000
  • 1999/12/13
    5 톤트럭
    2,250,000
  • 1999/12/13
    5 톤트럭
    1,750,000
  • 1999/12/11
    5 톤트럭
    2,750,000
  • 1999/12/11
    5 톤트럭
    2,050,000
  • 1999/12/11
    5 톤트럭
    1,750,000
  • 1999/12/10
    5 톤트럭
    2,850,000
  • 1999/12/10
    5 톤트럭
    2,250,000
  • 1999/12/10
    5 톤트럭
    1,750,000
  • 1999/12/9
    5 톤트럭
    2,850,000
  • 1999/12/9
    5 톤트럭
    2,250,000
  • 1999/12/9
    5 톤트럭
    1,750,000
  • 1999/12/8
    5 톤트럭
    2,850,000
  • 1999/12/8
    5 톤트럭
    2,250,000
  • 1999/12/8
    5 톤트럭
    1,750,000
  • 1999/12/7
    5 톤트럭
    3,100,000
  • 1999/12/7
    5 톤트럭
    2,350,000
  • 1999/12/7
    5 톤트럭
    1,850,000
  • 1999/12/6
    5 톤트럭
    3,350,000
  • 1999/12/6
    5 톤트럭
    2,750,000
  • 1999/12/6
    5 톤트럭
    2,200,000
  • 1999/12/4
    5 톤트럭
    3,350,000
  • 1999/12/4
    5 톤트럭
    2,750,000
  • 1999/12/4
    5 톤트럭
    2,200,000
  • 1999/12/3
    5 톤트럭
    3,000,000
  • 1999/12/3
    5 톤트럭
    2,550,000
  • 1999/12/3
    5 톤트럭
    2,150,000
  • 1999/12/2
    5 톤트럭
    2,850,000
  • 1999/12/2
    5 톤트럭
    2,350,000
  • 1999/12/2
    5 톤트럭
    2,000,000
  • 1999/12/1
    5 톤트럭
    2,650,000
  • 1999/12/1
    5 톤트럭
    2,150,000
  • 1999/12/1
    5 톤트럭
    1,850,000

다발무 1999년 11월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1999/11/30
    5 톤트럭
    2,750,000
  • 1999/11/30
    5 톤트럭
    2,250,000
  • 1999/11/30
    5 톤트럭
    1,900,000
  • 1999/11/29
    5 톤트럭
    2,750,000
  • 1999/11/29
    5 톤트럭
    2,250,000
  • 1999/11/29
    5 톤트럭
    1,900,000
  • 1999/11/27
    5 톤트럭
    2,600,000
  • 1999/11/27
    5 톤트럭
    2,100,000
  • 1999/11/27
    5 톤트럭
    1,850,000
  • 1999/11/26
    5 톤트럭
    2,650,000
  • 1999/11/26
    5 톤트럭
    2,150,000
  • 1999/11/26
    5 톤트럭
    1,750,000
  • 1999/11/24
    5 톤트럭
    2,650,000
  • 1999/11/24
    5 톤트럭
    2,150,000
  • 1999/11/24
    5 톤트럭
    1,600,000
  • 1999/11/23
    5 톤트럭
    2,750,000
  • 1999/11/23
    5 톤트럭
    2,250,000
  • 1999/11/23
    5 톤트럭
    1,750,000
  • 1999/11/22
    5 톤트럭
    2,500,000
  • 1999/11/22
    5 톤트럭
    2,000,000
  • 1999/11/22
    5 톤트럭
    1,350,000
  • 1999/11/20
    5 톤트럭
    2,300,000
  • 1999/11/20
    5 톤트럭
    1,800,000
  • 1999/11/20
    5 톤트럭
    1,250,000
  • 1999/11/19
    5 톤트럭
    2,250,000
  • 1999/11/19
    5 톤트럭
    1,750,000
  • 1999/11/19
    5 톤트럭
    1,250,000
  • 1999/11/18
    5 톤트럭
    2,350,000
  • 1999/11/18
    5 톤트럭
    1,800,000
  • 1999/11/18
    5 톤트럭
    1,300,000
  • 1999/11/17
    5 톤트럭
    2,500,000
  • 1999/11/17
    5 톤트럭
    1,800,000
  • 1999/11/17
    5 톤트럭
    1,400,000
  • 1999/11/16
    5 톤트럭
    2,500,000
  • 1999/11/16
    5 톤트럭
    1,950,000
  • 1999/11/16
    5 톤트럭
    1,400,000
  • 1999/11/15
    5 톤트럭
    2,500,000
  • 1999/11/15
    5 톤트럭
    2,000,000
  • 1999/11/15
    5 톤트럭
    1,400,000
  • 1999/11/13
    5 톤트럭
    2,500,000
  • 1999/11/13
    5 톤트럭
    2,000,000
  • 1999/11/13
    5 톤트럭
    1,500,000
  • 1999/11/12
    5 톤트럭
    2,600,000
  • 1999/11/12
    5 톤트럭
    2,100,000
  • 1999/11/12
    5 톤트럭
    1,500,000
  • 1999/11/11
    5 톤트럭
    2,650,000
  • 1999/11/11
    5 톤트럭
    2,000,000
  • 1999/11/11
    5 톤트럭
    1,350,000
  • 1999/11/10
    5 톤트럭
    2,850,000
  • 1999/11/10
    5 톤트럭
    2,100,000
  • 1999/11/10
    5 톤트럭
    1,350,000
  • 1999/11/9
    5 톤트럭
    2,850,000
  • 1999/11/9
    5 톤트럭
    2,100,000
  • 1999/11/9
    5 톤트럭
    1,350,000
  • 1999/11/8
    5 톤트럭
    2,900,000
  • 1999/11/8
    5 톤트럭
    2,150,000
  • 1999/11/8
    5 톤트럭
    1,350,000
  • 1999/11/6
    5 톤트럭
    2,900,000
  • 1999/11/6
    5 톤트럭
    2,150,000
  • 1999/11/6
    5 톤트럭
    1,350,000
  • 1999/11/5
    5 톤트럭
    3,100,000
  • 1999/11/5
    5 톤트럭
    2,250,000
  • 1999/11/5
    5 톤트럭
    1,400,000
  • 1999/11/4
    5 톤트럭
    3,350,000
  • 1999/11/4
    5 톤트럭
    2,450,000
  • 1999/11/4
    5 톤트럭
    1,550,000
  • 1999/11/3
    5 톤트럭
    3,500,000
  • 1999/11/3
    5 톤트럭
    2,600,000
  • 1999/11/3
    5 톤트럭
    1,650,000
  • 1999/11/2
    5 톤트럭
    3,500,000
  • 1999/11/2
    5 톤트럭
    2,600,000
  • 1999/11/2
    5 톤트럭
    1,650,000
  • 1999/11/1
    5 톤트럭
    4,000,000
  • 1999/11/1
    5 톤트럭
    3,150,000
  • 1999/11/1
    5 톤트럭
    1,950,000

다발무 1999년 10월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1999/10/30
    5 톤트럭
    2,750,000
  • 1999/10/30
    5 톤트럭
    2,250,000
  • 1999/10/30
    5 톤트럭
    1,750,000
  • 1999/10/29
    5 톤트럭
    3,075,000
  • 1999/10/29
    5 톤트럭
    2,400,000
  • 1999/10/29
    5 톤트럭
    1,500,000
  • 1999/10/28
    5 톤트럭
    3,050,000
  • 1999/10/28
    5 톤트럭
    2,500,000
  • 1999/10/28
    5 톤트럭
    1,900,000
  • 1999/10/27
    5 톤트럭
    3,075,000
  • 1999/10/27
    5 톤트럭
    2,500,000
  • 1999/10/27
    5 톤트럭
    1,900,000
  • 1999/10/26
    5 톤트럭
    3,150,000
  • 1999/10/26
    5 톤트럭
    2,425,000
  • 1999/10/26
    5 톤트럭
    1,725,000