다발무 2000년 12월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 2000/12/26
    5 톤트럭
    1,400,000
  • 2000/12/26
    5 톤트럭
    1,250,000
  • 2000/12/25
    5 톤트럭
    1,450,000
  • 2000/12/25
    5 톤트럭
    1,250,000
  • 2000/12/25
    5 톤트럭
    975,000
  • 2000/12/23
    5 톤트럭
    1,450,000
  • 2000/12/23
    5 톤트럭
    1,250,000
  • 2000/12/23
    5 톤트럭
    975,000
  • 2000/12/22
    5 톤트럭
    1,400,000
  • 2000/12/22
    5 톤트럭
    1,050,000
  • 2000/12/22
    5 톤트럭
    700,000
  • 2000/12/21
    5 톤트럭
    1,375,000
  • 2000/12/21
    5 톤트럭
    1,100,000
  • 2000/12/21
    5 톤트럭
    900,000
  • 2000/12/20
    5 톤트럭
    1,700,000
  • 2000/12/20
    5 톤트럭
    1,475,000
  • 2000/12/20
    5 톤트럭
    1,300,000
  • 2000/12/19
    5 톤트럭
    1,900,000
  • 2000/12/19
    5 톤트럭
    1,350,000
  • 2000/12/19
    5 톤트럭
    800,000
  • 2000/12/18
    5 톤트럭
    1,800,000
  • 2000/12/18
    5 톤트럭
    1,250,000
  • 2000/12/18
    5 톤트럭
    750,000
  • 2000/12/16
    5 톤트럭
    1,775,000
  • 2000/12/16
    5 톤트럭
    1,350,000
  • 2000/12/16
    5 톤트럭
    950,000
  • 2000/12/15
    5 톤트럭
    1,825,000
  • 2000/12/15
    5 톤트럭
    1,500,000
  • 2000/12/15
    5 톤트럭
    975,000
  • 2000/12/14
    5 톤트럭
    1,750,000
  • 2000/12/14
    5 톤트럭
    1,450,000
  • 2000/12/14
    5 톤트럭
    1,125,000
  • 2000/12/13
    5 톤트럭
    1,550,000
  • 2000/12/13
    5 톤트럭
    1,150,000
  • 2000/12/13
    5 톤트럭
    650,000
  • 2000/12/12
    5 톤트럭
    2,000,000
  • 2000/12/12
    5 톤트럭
    1,650,000
  • 2000/12/12
    5 톤트럭
    1,250,000
  • 2000/12/12
    5 톤트럭
    900,000
  • 2000/12/11
    5 톤트럭
    1,950,000
  • 2000/12/11
    5 톤트럭
    1,550,000
  • 2000/12/11
    5 톤트럭
    1,150,000
  • 2000/12/11
    5 톤트럭
    850,000
  • 2000/12/9
    5 톤트럭
    2,400,000
  • 2000/12/9
    5 톤트럭
    1,900,000
  • 2000/12/9
    5 톤트럭
    1,300,000
  • 2000/12/9
    5 톤트럭
    775,000
  • 2000/12/8
    5 톤트럭
    1,950,000
  • 2000/12/8
    5 톤트럭
    1,575,000
  • 2000/12/8
    5 톤트럭
    1,025,000
  • 2000/12/8
    5 톤트럭
    600,000
  • 2000/12/7
    5 톤트럭
    2,200,000
  • 2000/12/7
    5 톤트럭
    1,700,000
  • 2000/12/7
    5 톤트럭
    1,100,000
  • 2000/12/7
    5 톤트럭
    650,000
  • 2000/12/6
    5 톤트럭
    1,850,000
  • 2000/12/6
    5 톤트럭
    1,550,000
  • 2000/12/6
    5 톤트럭
    1,150,000
  • 2000/12/6
    5 톤트럭
    800,000
  • 2000/12/5
    5 톤트럭
    2,650,000
  • 2000/12/5
    5 톤트럭
    2,150,000
  • 2000/12/5
    5 톤트럭
    1,625,000
  • 2000/12/5
    5 톤트럭
    1,200,000
  • 2000/12/4
    5 톤트럭
    2,425,000
  • 2000/12/4
    5 톤트럭
    1,950,000
  • 2000/12/4
    5 톤트럭
    1,650,000
  • 2000/12/4
    5 톤트럭
    1,150,000
  • 2000/12/2
    5 톤트럭
    2,100,000
  • 2000/12/2
    5 톤트럭
    1,675,000
  • 2000/12/2
    5 톤트럭
    1,425,000
  • 2000/12/2
    5 톤트럭
    900,000
  • 2000/12/1
    5 톤트럭
    1,650,000
  • 2000/12/1
    5 톤트럭
    1,400,000
  • 2000/12/1
    5 톤트럭
    1,150,000
  • 2000/12/1
    5 톤트럭
    800,000