다발무 2002년 11월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 2002/11/30
    5 톤트럭
    4,395,000
  • 2002/11/30
    5 톤트럭
    3,280,000
  • 2002/11/30
    5 톤트럭
    2,450,000
  • 2002/11/30
    5 톤트럭
    1,550,000
  • 2002/11/29
    5 톤트럭
    4,550,000
  • 2002/11/29
    5 톤트럭
    3,200,000
  • 2002/11/29
    5 톤트럭
    2,450,000
  • 2002/11/29
    5 톤트럭
    1,700,000
  • 2002/11/28
    5 톤트럭
    4,415,000
  • 2002/11/28
    5 톤트럭
    3,275,000
  • 2002/11/28
    5 톤트럭
    2,525,000
  • 2002/11/28
    5 톤트럭
    1,410,000
  • 2002/11/27
    5 톤트럭
    3,670,000
  • 2002/11/27
    5 톤트럭
    2,725,000
  • 2002/11/27
    5 톤트럭
    1,800,000
  • 2002/11/27
    5 톤트럭
    1,100,000
  • 2002/11/26
    5 톤트럭
    4,255,000
  • 2002/11/26
    5 톤트럭
    3,200,000
  • 2002/11/26
    5 톤트럭
    1,850,000
  • 2002/11/26
    5 톤트럭
    900,000
  • 2002/11/25
    5 톤트럭
    4,310,000
  • 2002/11/25
    5 톤트럭
    3,550,000
  • 2002/11/25
    5 톤트럭
    2,650,000
  • 2002/11/25
    5 톤트럭
    1,930,000
  • 2002/11/23
    5 톤트럭
    4,250,000
  • 2002/11/23
    5 톤트럭
    3,650,000
  • 2002/11/23
    5 톤트럭
    2,850,000
  • 2002/11/23
    5 톤트럭
    1,815,000
  • 2002/11/22
    5 톤트럭
    4,220,000
  • 2002/11/22
    5 톤트럭
    3,480,000
  • 2002/11/22
    5 톤트럭
    2,860,000
  • 2002/11/22
    5 톤트럭
    2,300,000
  • 2002/11/21
    5 톤트럭
    4,510,000
  • 2002/11/21
    5 톤트럭
    3,900,000
  • 2002/11/21
    5 톤트럭
    3,350,000
  • 2002/11/21
    5 톤트럭
    2,475,000
  • 2002/11/20
    5 톤트럭
    4,460,000
  • 2002/11/20
    5 톤트럭
    3,810,000
  • 2002/11/20
    5 톤트럭
    3,450,000
  • 2002/11/20
    5 톤트럭
    2,700,000
  • 2002/11/19
    5 톤트럭
    3,755,000
  • 2002/11/19
    5 톤트럭
    3,325,000
  • 2002/11/19
    5 톤트럭
    3,000,000
  • 2002/11/19
    5 톤트럭
    2,550,000
  • 2002/11/18
    5 톤트럭
    3,140,000
  • 2002/11/18
    5 톤트럭
    2,850,000
  • 2002/11/18
    5 톤트럭
    2,550,000
  • 2002/11/18
    5 톤트럭
    2,250,000
  • 2002/11/16
    5 톤트럭
    2,665,000
  • 2002/11/16
    5 톤트럭
    2,300,000
  • 2002/11/16
    5 톤트럭
    1,950,000
  • 2002/11/16
    5 톤트럭
    1,400,000
  • 2002/11/15
    5 톤트럭
    2,560,000
  • 2002/11/15
    5 톤트럭
    2,325,000
  • 2002/11/15
    5 톤트럭
    1,900,000
  • 2002/11/15
    5 톤트럭
    1,265,000
  • 2002/11/14
    5 톤트럭
    2,565,000
  • 2002/11/14
    5 톤트럭
    2,300,000
  • 2002/11/14
    5 톤트럭
    1,800,000
  • 2002/11/14
    5 톤트럭
    1,310,000
  • 2002/11/13
    5 톤트럭
    2,725,000
  • 2002/11/13
    5 톤트럭
    2,375,000
  • 2002/11/13
    5 톤트럭
    1,925,000
  • 2002/11/13
    5 톤트럭
    1,350,000
  • 2002/11/12
    5 톤트럭
    2,685,000
  • 2002/11/12
    5 톤트럭
    2,300,000
  • 2002/11/12
    5 톤트럭
    1,900,000
  • 2002/11/12
    5 톤트럭
    1,500,000
  • 2002/11/11
    5 톤트럭
    2,825,000
  • 2002/11/11
    5 톤트럭
    2,525,000
  • 2002/11/11
    5 톤트럭
    2,150,000
  • 2002/11/11
    5 톤트럭
    1,700,000
  • 2002/11/9
    5 톤트럭
    3,000,000
  • 2002/11/9
    5 톤트럭
    2,400,000
  • 2002/11/9
    5 톤트럭
    2,050,000
  • 2002/11/9
    5 톤트럭
    1,550,000
  • 2002/11/8
    5 톤트럭
    2,740,000
  • 2002/11/8
    5 톤트럭
    2,365,000
  • 2002/11/8
    5 톤트럭
    2,065,000
  • 2002/11/8
    5 톤트럭
    1,775,000
  • 2002/11/7
    5 톤트럭
    2,710,000
  • 2002/11/7
    5 톤트럭
    2,400,000
  • 2002/11/7
    5 톤트럭
    2,000,000
  • 2002/11/7
    5 톤트럭
    1,510,000
  • 2002/11/6
    5 톤트럭
    2,950,000
  • 2002/11/6
    5 톤트럭
    2,530,000
  • 2002/11/6
    5 톤트럭
    2,105,000
  • 2002/11/6
    5 톤트럭
    1,660,000
  • 2002/11/5
    5 톤트럭
    2,925,000
  • 2002/11/5
    5 톤트럭
    2,650,000
  • 2002/11/5
    5 톤트럭
    2,350,000
  • 2002/11/5
    5 톤트럭
    1,900,000
  • 2002/11/4
    5 톤트럭
    2,560,000
  • 2002/11/4
    5 톤트럭
    2,350,000
  • 2002/11/4
    5 톤트럭
    2,050,000
  • 2002/11/4
    5 톤트럭
    1,685,000
  • 2002/11/2
    5 톤트럭
    2,465,000
  • 2002/11/2
    5 톤트럭
    1,990,000
  • 2002/11/2
    5 톤트럭
    1,575,000
  • 2002/11/2
    5 톤트럭
    1,250,000
  • 2002/11/1
    5 톤트럭
    2,575,000
  • 2002/11/1
    5 톤트럭
    2,035,000
  • 2002/11/1
    5 톤트럭
    1,610,000
  • 2002/11/1
    5 톤트럭
    1,250,000