다발무 2000년 11월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 2000/11/30
    5 톤트럭
    1,875,000
  • 2000/11/30
    5 톤트럭
    1,375,000
  • 2000/11/30
    5 톤트럭
    1,075,000
  • 2000/11/30
    5 톤트럭
    650,000
  • 2000/11/29
    5 톤트럭
    2,125,000
  • 2000/11/29
    5 톤트럭
    1,475,000
  • 2000/11/29
    5 톤트럭
    1,100,000
  • 2000/11/29
    5 톤트럭
    700,000
  • 2000/11/28
    5 톤트럭
    1,800,000
  • 2000/11/28
    5 톤트럭
    1,550,000
  • 2000/11/28
    5 톤트럭
    1,250,000
  • 2000/11/28
    5 톤트럭
    900,000
  • 2000/11/27
    5 톤트럭
    1,875,000
  • 2000/11/27
    5 톤트럭
    1,600,000
  • 2000/11/27
    5 톤트럭
    1,350,000
  • 2000/11/27
    5 톤트럭
    925,000
  • 2000/11/25
    5 톤트럭
    1,975,000
  • 2000/11/25
    5 톤트럭
    1,550,000
  • 2000/11/25
    5 톤트럭
    1,100,000
  • 2000/11/25
    5 톤트럭
    800,000
  • 2000/11/24
    5 톤트럭
    2,425,000
  • 2000/11/24
    5 톤트럭
    1,775,000
  • 2000/11/24
    5 톤트럭
    1,300,000
  • 2000/11/24
    5 톤트럭
    900,000
  • 2000/11/23
    5 톤트럭
    2,150,000
  • 2000/11/23
    5 톤트럭
    1,800,000
  • 2000/11/23
    5 톤트럭
    1,450,000
  • 2000/11/23
    5 톤트럭
    1,075,000
  • 2000/11/22
    5 톤트럭
    2,550,000
  • 2000/11/22
    5 톤트럭
    1,900,000
  • 2000/11/22
    5 톤트럭
    1,400,000
  • 2000/11/22
    5 톤트럭
    1,050,000
  • 2000/11/21
    5 톤트럭
    2,400,000
  • 2000/11/21
    5 톤트럭
    1,900,000
  • 2000/11/21
    5 톤트럭
    1,450,000
  • 2000/11/21
    5 톤트럭
    950,000
  • 2000/11/20
    5 톤트럭
    2,450,000
  • 2000/11/20
    5 톤트럭
    1,875,000
  • 2000/11/20
    5 톤트럭
    1,475,000
  • 2000/11/20
    5 톤트럭
    1,100,000
  • 2000/11/18
    5 톤트럭
    2,100,000
  • 2000/11/18
    5 톤트럭
    1,700,000
  • 2000/11/18
    5 톤트럭
    1,350,000
  • 2000/11/18
    5 톤트럭
    950,000
  • 2000/11/17
    5 톤트럭
    2,000,000
  • 2000/11/17
    5 톤트럭
    1,600,000
  • 2000/11/17
    5 톤트럭
    1,300,000
  • 2000/11/17
    5 톤트럭
    950,000
  • 2000/11/16
    5 톤트럭
    2,800,000
  • 2000/11/16
    5 톤트럭
    2,150,000
  • 2000/11/16
    5 톤트럭
    1,750,000
  • 2000/11/16
    5 톤트럭
    1,300,000
  • 2000/11/15
    5 톤트럭
    2,250,000
  • 2000/11/15
    5 톤트럭
    1,825,000
  • 2000/11/15
    5 톤트럭
    1,500,000
  • 2000/11/15
    5 톤트럭
    1,100,000
  • 2000/11/14
    5 톤트럭
    2,650,000
  • 2000/11/14
    5 톤트럭
    2,250,000
  • 2000/11/14
    5 톤트럭
    1,850,000
  • 2000/11/14
    5 톤트럭
    1,400,000
  • 2000/11/13
    5 톤트럭
    2,750,000
  • 2000/11/13
    5 톤트럭
    2,250,000
  • 2000/11/13
    5 톤트럭
    1,700,000
  • 2000/11/13
    5 톤트럭
    1,150,000
  • 2000/11/11
    5 톤트럭
    1,750,000
  • 2000/11/11
    5 톤트럭
    1,500,000
  • 2000/11/11
    5 톤트럭
    1,125,000
  • 2000/11/11
    5 톤트럭
    800,000
  • 2000/11/10
    5 톤트럭
    1,950,000
  • 2000/11/10
    5 톤트럭
    1,700,000
  • 2000/11/10
    5 톤트럭
    1,300,000
  • 2000/11/10
    5 톤트럭
    925,000
  • 2000/11/9
    5 톤트럭
    1,850,000
  • 2000/11/9
    5 톤트럭
    1,525,000
  • 2000/11/9
    5 톤트럭
    875,000
  • 2000/11/8
    5 톤트럭
    2,400,000
  • 2000/11/8
    5 톤트럭
    2,075,000
  • 2000/11/8
    5 톤트럭
    1,725,000
  • 2000/11/8
    5 톤트럭
    1,250,000
  • 2000/11/7
    5 톤트럭
    1,850,000
  • 2000/11/7
    5 톤트럭
    1,300,000
  • 2000/11/7
    5 톤트럭
    2,500,000
  • 2000/11/7
    5 톤트럭
    2,250,000
  • 2000/11/6
    5 톤트럭
    2,950,000
  • 2000/11/6
    5 톤트럭
    2,400,000
  • 2000/11/6
    5 톤트럭
    1,950,000
  • 2000/11/6
    5 톤트럭
    1,250,000
  • 2000/11/4
    5 톤트럭
    3,000,000
  • 2000/11/4
    5 톤트럭
    2,200,000
  • 2000/11/4
    5 톤트럭
    1,700,000
  • 2000/11/4
    5 톤트럭
    975,000
  • 2000/11/3
    5 톤트럭
    3,000,000
  • 2000/11/3
    5 톤트럭
    2,250,000
  • 2000/11/3
    5 톤트럭
    1,850,000
  • 2000/11/3
    5 톤트럭
    1,250,000
  • 2000/11/2
    5 톤트럭
    2,750,000
  • 2000/11/2
    5 톤트럭
    2,050,000
  • 2000/11/2
    5 톤트럭
    1,400,000
  • 2000/11/2
    5 톤트럭
    1,000,000
  • 2000/11/1
    5 톤트럭
    2,850,000
  • 2000/11/1
    5 톤트럭
    2,250,000
  • 2000/11/1
    5 톤트럭
    1,800,000
  • 2000/11/1
    5 톤트럭
    1,150,000