다발무 1995년 12월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1995/12/16
    5 톤트럭
    1,300,000
  • 1995/12/16
    5 톤트럭
    1,050,000
  • 1995/12/16
    5 톤트럭
    750,000
  • 1995/12/15
    5 톤트럭
    1,500,000
  • 1995/12/15
    5 톤트럭
    1,200,000
  • 1995/12/15
    5 톤트럭
    900,000
  • 1995/12/14
    5 톤트럭
    900,000
  • 1995/12/14
    5 톤트럭
    1,500,000
  • 1995/12/14
    5 톤트럭
    1,200,000
  • 1995/12/13
    5 톤트럭
    1,650,000
  • 1995/12/13
    5 톤트럭
    1,350,000
  • 1995/12/13
    5 톤트럭
    1,050,000
  • 1995/12/12
    5 톤트럭
    1,650,000
  • 1995/12/12
    5 톤트럭
    1,350,000
  • 1995/12/12
    5 톤트럭
    1,050,000
  • 1995/12/11
    5 톤트럭
    2,000,000
  • 1995/12/11
    5 톤트럭
    1,600,000
  • 1995/12/11
    5 톤트럭
    1,200,000
  • 1995/12/9
    5 톤트럭
    2,750,000
  • 1995/12/9
    5 톤트럭
    2,250,000
  • 1995/12/9
    5 톤트럭
    1,800,000
  • 1995/12/8
    5 톤트럭
    2,250,000
  • 1995/12/8
    5 톤트럭
    1,750,000
  • 1995/12/8
    5 톤트럭
    1,250,000
  • 1995/12/7
    5 톤트럭
    2,250,000
  • 1995/12/7
    5 톤트럭
    1,750,000
  • 1995/12/7
    5 톤트럭
    1,250,000
  • 1995/12/6
    5 톤트럭
    2,750,000
  • 1995/12/6
    5 톤트럭
    2,250,000
  • 1995/12/6
    5 톤트럭
    1,750,000
  • 1995/12/5
    5 톤트럭
    2,250,000
  • 1995/12/5
    5 톤트럭
    1,750,000
  • 1995/12/5
    5 톤트럭
    1,350,000
  • 1995/12/4
    5 톤트럭
    1,800,000
  • 1995/12/4
    5 톤트럭
    1,600,000
  • 1995/12/4
    5 톤트럭
    1,350,000
  • 1995/12/2
    5 톤트럭
    1,700,000
  • 1995/12/2
    5 톤트럭
    1,400,000
  • 1995/12/2
    5 톤트럭
    1,050,000
  • 1995/12/1
    5 톤트럭
    1,650,000
  • 1995/12/1
    5 톤트럭
    1,250,000
  • 1995/12/1
    5 톤트럭
    900,000

다발무 1995년 11월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1995/11/30
    5 톤트럭
    1,400,000
  • 1995/11/30
    5 톤트럭
    1,150,000
  • 1995/11/30
    5 톤트럭
    850,000
  • 1995/11/29
    5 톤트럭
    1,600,000
  • 1995/11/29
    5 톤트럭
    1,200,000
  • 1995/11/29
    5 톤트럭
    850,000
  • 1995/11/28
    5 톤트럭
    1,600,000
  • 1995/11/28
    5 톤트럭
    1,200,000
  • 1995/11/28
    5 톤트럭
    850,000
  • 1995/11/27
    5 톤트럭
    1,600,000
  • 1995/11/27
    5 톤트럭
    1,200,000
  • 1995/11/27
    5 톤트럭
    850,000
  • 1995/11/24
    5 톤트럭
    1,300,000
  • 1995/11/24
    5 톤트럭
    1,100,000
  • 1995/11/24
    5 톤트럭
    850,000
  • 1995/11/23
    5 톤트럭
    1,600,000
  • 1995/11/23
    5 톤트럭
    1,300,000
  • 1995/11/23
    5 톤트럭
    950,000
  • 1995/11/22
    5 톤트럭
    1,600,000
  • 1995/11/22
    5 톤트럭
    1,300,000
  • 1995/11/22
    5 톤트럭
    950,000
  • 1995/11/21
    5 톤트럭
    1,300,000
  • 1995/11/21
    5 톤트럭
    1,100,000
  • 1995/11/21
    5 톤트럭
    900,000
  • 1995/11/20
    5 톤트럭
    1,300,000
  • 1995/11/20
    5 톤트럭
    1,050,000
  • 1995/11/20
    5 톤트럭
    800,000
  • 1995/11/18
    5 톤트럭
    1,400,000
  • 1995/11/18
    5 톤트럭
    1,150,000
  • 1995/11/18
    5 톤트럭
    850,000
  • 1995/11/17
    5 톤트럭
    1,400,000
  • 1995/11/17
    5 톤트럭
    1,150,000
  • 1995/11/17
    5 톤트럭
    850,000
  • 1995/11/16
    5 톤트럭
    1,400,000
  • 1995/11/16
    5 톤트럭
    1,150,000
  • 1995/11/16
    5 톤트럭
    850,000
  • 1995/11/15
    5 톤트럭
    1,200,000
  • 1995/11/15
    5 톤트럭
    1,000,000
  • 1995/11/15
    5 톤트럭
    750,000
  • 1995/11/14
    5 톤트럭
    1,600,000
  • 1995/11/14
    5 톤트럭
    1,200,000
  • 1995/11/14
    5 톤트럭
    850,000
  • 1995/11/13
    5 톤트럭
    1,600,000
  • 1995/11/13
    5 톤트럭
    1,200,000
  • 1995/11/13
    5 톤트럭
    850,000
  • 1995/11/11
    5 톤트럭
    1,600,000
  • 1995/11/11
    5 톤트럭
    1,200,000
  • 1995/11/11
    5 톤트럭
    850,000
  • 1995/11/10
    5 톤트럭
    1,600,000
  • 1995/11/10
    5 톤트럭
    1,200,000
  • 1995/11/10
    5 톤트럭
    850,000
  • 1995/11/9
    5 톤트럭
    1,700,000
  • 1995/11/9
    5 톤트럭
    1,450,000
  • 1995/11/9
    5 톤트럭
    1,150,000
  • 1995/11/8
    5 톤트럭
    1,200,000
  • 1995/11/8
    5 톤트럭
    950,000
  • 1995/11/8
    5 톤트럭
    700,000
  • 1995/11/7
    5 톤트럭
    1,400,000
  • 1995/11/7
    5 톤트럭
    1,150,000
  • 1995/11/7
    5 톤트럭
    825,000
  • 1995/11/6
    5 톤트럭
    1,600,000
  • 1995/11/6
    5 톤트럭
    1,400,000
  • 1995/11/6
    5 톤트럭
    1,200,000
  • 1995/11/4
    5 톤트럭
    1,600,000
  • 1995/11/4
    5 톤트럭
    1,400,000
  • 1995/11/4
    5 톤트럭
    1,200,000
  • 1995/11/3
    5 톤트럭
    1,900,000
  • 1995/11/3
    5 톤트럭
    1,650,000
  • 1995/11/3
    5 톤트럭
    1,400,000
  • 1995/11/2
    5 톤트럭
    1,900,000
  • 1995/11/2
    5 톤트럭
    1,650,000
  • 1995/11/2
    5 톤트럭
    1,400,000
  • 1995/11/1
    5 톤트럭
    1,900,000
  • 1995/11/1
    5 톤트럭
    1,650,000
  • 1995/11/1
    5 톤트럭
    1,400,000

다발무 1995년 10월 가격 결과

  • 날짜
    기준단위
    등급
    평균가(시세)
  • 1995/10/31
    5 톤트럭
    1,900,000
  • 1995/10/31
    5 톤트럭
    1,650,000
  • 1995/10/31
    5 톤트럭
    1,400,000
  • 1995/10/30
    5 톤트럭
    1,650,000
  • 1995/10/30
    5 톤트럭
    1,500,000
  • 1995/10/30
    5 톤트럭
    1,200,000
  • 1995/10/28
    5 톤트럭
    1,300,000
  • 1995/10/28
    5 톤트럭
    1,100,000
  • 1995/10/28
    5 톤트럭
    900,000
  • 1995/10/27
    5 톤트럭
    1,400,000
  • 1995/10/27
    5 톤트럭
    1,150,000
  • 1995/10/27
    5 톤트럭
    900,000
  • 1995/10/26
    5 톤트럭
    2,000,000
  • 1995/10/26
    5 톤트럭
    1,650,000
  • 1995/10/26
    5 톤트럭
    1,400,000
  • 1995/10/25
    5 톤트럭
    1,700,000
  • 1995/10/25
    5 톤트럭
    730,000
  • 1995/10/25
    5 톤트럭
    1,150,000
  • 1995/10/24
    5 톤트럭
    1,700,000
  • 1995/10/24
    5 톤트럭
    730,000
  • 1995/10/24
    5 톤트럭
    1,150,000
  • 1995/10/23
    5 톤트럭
    2,000,000
  • 1995/10/23
    5 톤트럭
    1,600,000
  • 1995/10/23
    5 톤트럭
    1,200,000
  • 1995/10/21
    5 톤트럭
    2,000,000
  • 1995/10/21
    5 톤트럭
    1,600,000
  • 1995/10/21
    5 톤트럭
    1,200,000
  • 1995/10/20
    5 톤트럭
    2,000,000
  • 1995/10/20
    5 톤트럭
    1,600,000
  • 1995/10/20
    5 톤트럭
    1,200,000
  • 1995/10/19
    5 톤트럭
    2,300,000
  • 1995/10/19
    5 톤트럭
    1,900,000
  • 1995/10/19
    5 톤트럭
    1,500,000